Recent Posts
Recent Comments
Jaimin on Planing some larch Lucy Jethwa on Parquet varnished Jaimin on Laying the link room floo… Jaimin on Preparation for flooring the l… Jaimin on The Parquet-Muncher Archives
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- March 2013
Categories
Meta
Monthly Archives: September 2013
Finished the inner cladding, starting the outer
Bridget has been unwell for a few days so progress halted for a while. Nana and Pop came up today, so Thomas and Pop managed to work extra hard to make up time. The inner cladding layer was finished, then … Continue reading
Posted in Uncategorized
Leave a comment
Cladding still
Progress has been slower this week, we’ve been quite busy and the evenings are much darker. We have done a bit more cladding along the south wall, the inner layer of larch now extends pretty much from the north round … Continue reading
Posted in Uncategorized
Leave a comment
More larch cladding
Today Thomas was on holiday (Aberdeen local holiday) so he cracked on with the cladding, mainly the south wall.
Posted in Uncategorized
Leave a comment
Starting the larch cladding
A lovely sunny day today and Nana and Pop were here, so we commenced the larch cladding. Thomas focused on the detailing around the windows: frame sealant between the sill and sub-sill; draft-proofing with Tyvek between the stud wall and … Continue reading
Posted in Uncategorized
1 Comment
Boxing-in the soffits
In order to draft-proof the gap between the roof membrane and the wall membrane, yesterday we (with the help of Oli) boxed in the soffits and applied a narrow band of Tyvek with the staple-gun.
Posted in Uncategorized
Leave a comment
Windows all in
Last night (by site light and torch) we finished installing the 5th and final window into this phase of the build. For some reason (possibly related to it being stored fully wrapped in cling-film, unlike the others) this one was … Continue reading
Posted in Uncategorized
Leave a comment
One window at a time…
Progress has been slow but steady, the second window is now installed, 3 to go. The 3 south facing windows are more square than the other two, making it much more difficult to hang the weights. The extra (relative) width … Continue reading
Posted in Uncategorized
Leave a comment
Finishing the window sills
After the frustration of the membrane, it was great to have Oli over for a few hours this morning to help install a sash window. We saw this as a learning exercise, and managed to get it installed fairly quickly. … Continue reading
Posted in Uncategorized
Leave a comment
Storm damage to membrane
Less than 24 hours after the membrane was up, strong winds this morning damaged it. It looks like it’s going to be okay, except for the ridge, which will need replaced (with a fresh roll of membrane unfortunately). A few … Continue reading
Posted in Uncategorized
Leave a comment
Window Sills
We’ve been unwell for about a week so not much has been done, but the window sills are progressing slowly. Thomas built a prototype out of some offcuts of structural timber, which was enough to satisfy us that we could … Continue reading
Posted in Uncategorized